Works are progressing very well and are on program. The ground floor transfer slab has been formed and poured and 95% of the ground floor structural walls have been installed. The 1st floor formwork is well underway and the concrete will be placed before the middle of March. Services have started to be installed within the basement and the Fire Pump has been placed.